Research, cleaning and recovery of soils impacted by human activities. Compliance with the Law on Contaminated Soil.
Image

Analysis of wastewater in septic tanks and cisterns at airport facilities in the east sector.
-
AENA


Analysis of wastewater in septic tanks and cisterns at airport facilities in the east sector.

-

AENA

  • Implementation of all wastewater quality analyses.
  • Sampling at the different facilities fitted with septic tanks
  • Evaluation of results and assessment of values obtained.

Analysis of wastewater in septic tanks and cisterns at airport facilities in the east sector.

AENA

  • Implementation of all wastewater quality analyses.
  • Sampling at the different facilities fitted with septic tanks
  • Evaluation of results and assessment of values obtained.

Image

Implementation of the Water Framework Directive. Quality of port water bodies in the Port of Barcelona (Barcelona)
-
AUTORITAT PORTUÀRIA DE BARCELONA


Implementation of the Water Framework Directive. Quality of port water bodies in the Port of Barcelona (Barcelona)

-

AUTORITAT PORTUÀRIA DE BARCELONA

  • Water Framework Directive (2000/60/EC)
  • Quality parameters: thermohaline circulation, turbidity, transparency, suspended matter, pH, BO5, COT, dissolved oxygen, percentage saturation, nutrients, N/P, chlorophyll.

Implementation of the Water Framework Directive. Quality of port water bodies in the Port of Barcelona (Barcelona)

AUTORITAT PORTUÀRIA DE BARCELONA

  • Water Framework Directive (2000/60/EC)
  • Quality parameters: thermohaline circulation, turbidity, transparency, suspended matter, pH, BO5, COT, dissolved oxygen, percentage saturation, nutrients, N/P, chlorophyll.

Image

Monitoring aquifers around the Berta quarry. Sant Cugat del Vallès.
-
JAIME FRANQUESA SA


Monitoring aquifers around the Berta quarry. Sant Cugat del Vallès.

-

JAIME FRANQUESA SA

  • Monitoring using continuous measurement equipment: water level, temperature and conductivity
  • Network of 10 points: 3 surface piezometers and 7 at depth
  • Data obtained at 10-minute frequencies

Monitoring aquifers around the Berta quarry. Sant Cugat del Vallès.

JAIME FRANQUESA SA

  • Monitoring using continuous measurement equipment: water level, temperature and conductivity
  • Network of 10 points: 3 surface piezometers and 7 at depth
  • Data obtained at 10-minute frequencies

Image

Programme of environmental actions and EMP of construction work in decanting wetlands. Ebro Delta Water Quality Programme.
-
FERROVIAL - AGROMAN


Programme of environmental actions and EMP of construction work in decanting wetlands. Ebro Delta Water Quality Programme.

-

FERROVIAL - AGROMAN

  • Development of Environmental Action Programme to tender the first phase in the Ebro Delta Water Quality Programme. Replenishing bays with freshwater from irrigation canals.
  • Preparation of Environmental Management Plan

Programme of environmental actions and EMP of construction work in decanting wetlands. Ebro Delta Water Quality Programme.

FERROVIAL - AGROMAN

  • Development of Environmental Action Programme to tender the first phase in the Ebro Delta Water Quality Programme. Replenishing bays with freshwater from irrigation canals.
  • Preparation of Environmental Management Plan

Image

Monitoring the environmental quality of groundwater at the old Honeywell factory in Granollers
-
VALLES BUSINESS PARK, S.L.U.


Monitoring the environmental quality of groundwater at the old Honeywell factory in Granollers

-

VALLES BUSINESS PARK, S.L.U.

  • Plume study of VOC contamination in the mountain stream located to the south.
  • Environmental technical assistance for works to clean soil and study the quality of groundwater inside the decontaminated  area around the Can Ninou mountain stream.
  • Installation of a permeable reactive barrier (PRB).

Monitoring the environmental quality of groundwater at the old Honeywell factory in Granollers

VALLES BUSINESS PARK, S.L.U.

  • Plume study of VOC contamination in the mountain stream located to the south.
  • Environmental technical assistance for works to clean soil and study the quality of groundwater inside the decontaminated  area around the Can Ninou mountain stream.
  • Installation of a permeable reactive barrier (PRB).

Image

Monitoring surface and underground water in the northern area of the Segarra – Garrigues.
-
ASG / INFRAESTRUCTURES


Monitoring surface and underground water in the northern area of the Segarra – Garrigues.

-

ASG / INFRAESTRUCTURES

  • Design of the control network and monitoring of the quality and quantity of surface and underground water
  • Sampling, analysis and annual  monitoring report.
  • Hydrogeological studies.
  • Proposing and designing corrective measures if necessary.

Monitoring surface and underground water in the northern area of the Segarra – Garrigues.

ASG / INFRAESTRUCTURES

  • Design of the control network and monitoring of the quality and quantity of surface and underground water
  • Sampling, analysis and annual  monitoring report.
  • Hydrogeological studies.
  • Proposing and designing corrective measures if necessary.

Image

Biodiversity in the first phase of works at Ca n’Alemany. Viladecans
-
UTE SECTOR CA N’ALEMANY


Biodiversity in the first phase of works at Ca n’Alemany. Viladecans

-

UTE SECTOR CA N’ALEMANY

  • Field prospecting
  • Interpretation of the quality of habitats
  • Evaluation of the presence of protected species. Stripe-necked terrapin.
  • Establishment of active measures to protect the stripe-necked terrapin during works. Translocation.

Biodiversity in the first phase of works at Ca n’Alemany. Viladecans

UTE SECTOR CA N’ALEMANY

  • Field prospecting
  • Interpretation of the quality of habitats
  • Evaluation of the presence of protected species. Stripe-necked terrapin.
  • Establishment of active measures to protect the stripe-necked terrapin during works. Translocation.

Image

Bionomic characterisation of marine flowering plant communities on the Garraf Coast site (Barcelona)
-
DIPUTACIÓ DE BARCELONA


Bionomic characterisation of marine flowering plant communities on the Garraf Coast site (Barcelona)

-

DIPUTACIÓ DE BARCELONA

  • Area:  3,400 ha
  • Depth: 0-30 m
  • Characterisation of communities associated with Posidònia oceànica and Cymodocea nodosa meadows
  • Natura 2000 Network “Costes del Garraf

Bionomic characterisation of marine flowering plant communities on the Garraf Coast site (Barcelona)

DIPUTACIÓ DE BARCELONA

  • Area:  3,400 ha
  • Depth: 0-30 m
  • Characterisation of communities associated with Posidònia oceànica and Cymodocea nodosa meadows
  • Natura 2000 Network “Costes del Garraf

Image

Characterisation of the marine space for the expansion of the Port of Tarragona
-
AUTORITAT PORTUÀRIA DE TARRAGONA


Characterisation of the marine space for the expansion of the Port of Tarragona

-

AUTORITAT PORTUÀRIA DE TARRAGONA

  • Study of the biotic environment to detect any possible environmental factors
  • Bionomic characterisation
  • Characterisation of the sea floor
  • Study area: 1,000 ha

Characterisation of the marine space for the expansion of the Port of Tarragona

AUTORITAT PORTUÀRIA DE TARRAGONA

  • Study of the biotic environment to detect any possible environmental factors
  • Bionomic characterisation
  • Characterisation of the sea floor
  • Study area: 1,000 ha

Image

Bionomic and bathymetric survey of the Cap de Creus Integral Nature Reserve and the Cap Gros-Cap de Creus and Cap Norfeu partial nature reserves (Girona)
-
PORTS DE LA GENERALITAT


Bionomic and bathymetric survey of the Cap de Creus Integral Nature Reserve and the Cap Gros-Cap de Creus and Cap Norfeu partial nature reserves (Girona)

-

PORTS DE LA GENERALITAT

  • Underwater prospecting dives
  • Geolocation of posidonia meadows
  • Bathymetric and bionomic survey
  • Preparation of a GIS with information about flowering plants.

Bionomic and bathymetric survey of the Cap de Creus Integral Nature Reserve and the Cap Gros-Cap de Creus and Cap Norfeu partial nature reserves (Girona)

PORTS DE LA GENERALITAT

  • Underwater prospecting dives
  • Geolocation of posidonia meadows
  • Bathymetric and bionomic survey
  • Preparation of a GIS with information about flowering plants.

Image

Expert report on the Torrent de Can Magrans biological corridor, Cerdanyola del Vallès (Barcelona).
-
Unibail - Rodamco Steam, S.L.


Expert report on the Torrent de Can Magrans biological corridor, Cerdanyola del Vallès (Barcelona).

-

Unibail - Rodamco Steam, S.L.

  • Study of the feasibility of a biological corridor in the framework of an urban development project.
  • Using of night photography and video trapping.
  • Evaluation of the functioning of the corridor.

Expert report on the Torrent de Can Magrans biological corridor, Cerdanyola del Vallès (Barcelona).

Unibail - Rodamco Steam, S.L.

  • Study of the feasibility of a biological corridor in the framework of an urban development project.
  • Using of night photography and video trapping.
  • Evaluation of the functioning of the corridor.

Image

Preliminary fauna prospecting for the most valuable bird species in the area around works to construct the Gerri de la Sal turnoff. N-260 road.
-
UTE Variante Gerri de la Sal.


Preliminary fauna prospecting for the most valuable bird species in the area around works to construct the Gerri de la Sal turnoff. N-260 road.

-

UTE Variante Gerri de la Sal.

  • Study of biodiversity in a Pyrenean environment containing Natura 2000 Network sites.
  • Methodical bird observation visits.
  • Effective identification of nesting protected birds of prey.

Preliminary fauna prospecting for the most valuable bird species in the area around works to construct the Gerri de la Sal turnoff. N-260 road.

UTE Variante Gerri de la Sal.

  • Study of biodiversity in a Pyrenean environment containing Natura 2000 Network sites.
  • Methodical bird observation visits.
  • Effective identification of nesting protected birds of prey.

Image

Detailed study of the impact of dry bulk on air quality and proposal for good practice manual in the Port of Tarragona
-
AUTORITAT PORTUÀRIA DE TARRAGONA


Detailed study of the impact of dry bulk on air quality and proposal for good practice manual in the Port of Tarragona

-

AUTORITAT PORTUÀRIA DE TARRAGONA

  • Measurement of PM10 using fixed station (HVS)
  • Mineralogical characterisation by X-Ray Powder Diffraction (XRD) CSIC
  • Measurement of PM10 using manual equipment.
  • Modelling PM10 dispersion of all grain types present
  • Good practice manual

Detailed study of the impact of dry bulk on air quality and proposal for good practice manual in the Port of Tarragona

AUTORITAT PORTUÀRIA DE TARRAGONA

  • Measurement of PM10 using fixed station (HVS)
  • Mineralogical characterisation by X-Ray Powder Diffraction (XRD) CSIC
  • Measurement of PM10 using manual equipment.
  • Modelling PM10 dispersion of all grain types present
  • Good practice manual

Image

Action Plan to Improve Air Quality in the town of Sant Andreu de la Barca.
-
DIPUTACIÓ DE BARCELONA


Action Plan to Improve Air Quality in the town of Sant Andreu de la Barca.

-

DIPUTACIÓ DE BARCELONA

  • Area: Municipality of Sant Andreu de la Barca
  • Mobility study; Inventory of the municipal vehicle fleet and factory facilities
  • Inventory and calculation of emissions
  • Air quality: PM10m, NO2,
  • Action Plan: proposed measures to reduce air pollution

Action Plan to Improve Air Quality in the town of Sant Andreu de la Barca.

DIPUTACIÓ DE BARCELONA

  • Area: Municipality of Sant Andreu de la Barca
  • Mobility study; Inventory of the municipal vehicle fleet and factory facilities
  • Inventory and calculation of emissions
  • Air quality: PM10m, NO2,
  • Action Plan: proposed measures to reduce air pollution

Image

Monitoring air quality in the Port of Tarragona. Study of air quality. Study to determine actions to improve environmental quality around the Moll de Costa and Moll de Llevant docks in the Port of Tarragona.
-
PORT DE TARRAGONA


Monitoring air quality in the Port of Tarragona. Study of air quality. Study to determine actions to improve environmental quality around the Moll de Costa and Moll de Llevant docks in the Port of Tarragona.

-

PORT DE TARRAGONA

  • Measurement of PM10 using fixed station (HVS)
  • Mineralogical characterisation by X-Ray Powder Diffraction (XRD) CSIC
  • Measurement of PM10 using manual equipment.
  • Modelling PM10 dispersion
  • Corrective and palliative measures

Monitoring air quality in the Port of Tarragona. Study of air quality. Study to determine actions to improve environmental quality around the Moll de Costa and Moll de Llevant docks in the Port of Tarragona.

PORT DE TARRAGONA

  • Measurement of PM10 using fixed station (HVS)
  • Mineralogical characterisation by X-Ray Powder Diffraction (XRD) CSIC
  • Measurement of PM10 using manual equipment.
  • Modelling PM10 dispersion
  • Corrective and palliative measures

Image

Monitoring air quality around the works in the project to develop the Barcelonès Plan in Abrera. Baix Llobregat.
-
FOMENTO AGRÍCOLA Y GANADERO, SL.


Monitoring air quality around the works in the project to develop the Barcelonès Plan in Abrera. Baix Llobregat.

-

FOMENTO AGRÍCOLA Y GANADERO, SL.

  • Total area of Partial Plan: 316,683 m2
  • Measurement of PM10 using portable measuring equipment throughout the area.
  • 5 measuring stations: 3 within the direct sphere of influence of the works; 2 exterior, for potential receivers

Monitoring air quality around the works in the project to develop the Barcelonès Plan in Abrera. Baix Llobregat.

FOMENTO AGRÍCOLA Y GANADERO, SL.

  • Total area of Partial Plan: 316,683 m2
  • Measurement of PM10 using portable measuring equipment throughout the area.
  • 5 measuring stations: 3 within the direct sphere of influence of the works; 2 exterior, for potential receivers

Image

Monitoring air quality as part of environmental control of the implementation of the Partial Plan for the Directional Centre of Cerdanyola del Vallès.
-
CONSORCI DE CERDANYOLA


Monitoring air quality as part of environmental control of the implementation of the Partial Plan for the Directional Centre of Cerdanyola del Vallès.

-

CONSORCI DE CERDANYOLA

  • Total area of Partial Plan: approximately 340 ha
  • Area included in Annex 2 of Decree 226/2006, area of special air protection.
  • Measurement of PM10 using fixed station (HVS)
  • Measurement of PM10 using manual

Monitoring air quality as part of environmental control of the implementation of the Partial Plan for the Directional Centre of Cerdanyola del Vallès.

CONSORCI DE CERDANYOLA

  • Total area of Partial Plan: approximately 340 ha
  • Area included in Annex 2 of Decree 226/2006, area of special air protection.
  • Measurement of PM10 using fixed station (HVS)
  • Measurement of PM10 using manual

Image

Environmental sensorisation. Reform of Avinguda Diagonal as regards passages, side lanes and pavements. Francesc Macià-Passeig de Gràcia section. Barcelona
-
BIMSA


Environmental sensorisation. Reform of Avinguda Diagonal as regards passages, side lanes and pavements. Francesc Macià-Passeig de Gràcia section. Barcelona

-

BIMSA

  • Remote environmental monitoring
  • Monitoring of PM10 and noise using low-cost sensors.
  • 5 control points along the section of works.
  • Environmental  audit in real time (hourly and daily data)
  • Consulting services for the implementation of improvement works and proposed corrective measures

Environmental sensorisation. Reform of Avinguda Diagonal as regards passages, side lanes and pavements. Francesc Macià-Passeig de Gràcia section. Barcelona

BIMSA

  • Remote environmental monitoring
  • Monitoring of PM10 and noise using low-cost sensors.
  • 5 control points along the section of works.
  • Environmental  audit in real time (hourly and daily data)
  • Consulting services for the implementation of improvement works and proposed corrective measures

Image

Environmental assistance on concessionary works on the C-17 road, Vic – Ripoll section (Barcelona)
-
CEDINSA


Environmental assistance on concessionary works on the C-17 road, Vic – Ripoll section (Barcelona)

-

CEDINSA

  • Environmental consulting and coordination throughout the duration of the works.
  • Project to widen the C-17 road between KP 75+400 and 93+500.
  • Compliance with Environmental Impact Statement and control of environmental vectors.

Environmental assistance on concessionary works on the C-17 road, Vic – Ripoll section (Barcelona)

CEDINSA

  • Environmental consulting and coordination throughout the duration of the works.
  • Project to widen the C-17 road between KP 75+400 and 93+500.
  • Compliance with Environmental Impact Statement and control of environmental vectors.

Image

Environmental management of works to widen the Eix Transversal trunk road. Section: Cervera – Manresa
-
CEDINSA


Environmental management of works to widen the Eix Transversal trunk road. Section: Cervera – Manresa

-

CEDINSA

  • C-25 road , KP 82+000 to 236+000  from Cervera to Manresa
  • Monitoring of environmental impacts and environmental quality of the vectors of the work and surrounding area.
  • Implementation of corrective measures for environmental impact.

Environmental management of works to widen the Eix Transversal trunk road. Section: Cervera – Manresa

CEDINSA

  • C-25 road , KP 82+000 to 236+000  from Cervera to Manresa
  • Monitoring of environmental impacts and environmental quality of the vectors of the work and surrounding area.
  • Implementation of corrective measures for environmental impact.

Image

Environmental management of work on infrastructure at the Port of Badalona (Barcelona)
-
MARINA BADALONA


Environmental management of work on infrastructure at the Port of Badalona (Barcelona)

-

MARINA BADALONA

  • Occupying approximately 1 km of coast and a total area of  28.65 ha.
  • Water surface: 16.55
  • Dyke 700 m in length
  • Fishing dock: 18,500 m2 on land and 20.500 m2 on water, with capacity for 111 mooring places

Environmental management of work on infrastructure at the Port of Badalona (Barcelona)

MARINA BADALONA

  • Occupying approximately 1 km of coast and a total area of  28.65 ha.
  • Water surface: 16.55
  • Dyke 700 m in length
  • Fishing dock: 18,500 m2 on land and 20.500 m2 on water, with capacity for 111 mooring places

Image

Environmental management of works on Line 9 of the Metro de Barcelona underground system
-
Payma Cotas, SAU


Environmental management of works on Line 9 of the Metro de Barcelona underground system

-

Payma Cotas, SAU

  • 3.9 km section of TMB Line 9, between Zona Universitària and Sagrera – Meridiana stations
  • Attendance of meetings between owners and environmental body (Mixed Commission)
  • Management of 860,000 m3 from tunnelling work.
  • Treatment and management of water from tunnelling work (WWTSs)
  • Control of noise pollution from  access chamber and station shafts.

Environmental management of works on Line 9 of the Metro de Barcelona underground system

Payma Cotas, SAU

  • 3.9 km section of TMB Line 9, between Zona Universitària and Sagrera – Meridiana stations
  • Attendance of meetings between owners and environmental body (Mixed Commission)
  • Management of 860,000 m3 from tunnelling work.
  • Treatment and management of water from tunnelling work (WWTSs)
  • Control of noise pollution from  access chamber and station shafts.

Image

Environmental management of works to convert the Segarra – Garrigues system into an irrigation system.
-
Aigües del Segarra


Environmental management of works to convert the Segarra – Garrigues system into an irrigation system.

-

Aigües del Segarra

  • Environmental monitoring of the works to concentrate plots, primary network, secondary and distribution network of the Segarra – Garrigues.
  • Control of vectors
  • Design of specific environmental monitoring plans for each work, and monthly monitoring reports.
  • Attendance at mixed commission meetings.

Environmental management of works to convert the Segarra – Garrigues system into an irrigation system.

Aigües del Segarra

  • Environmental monitoring of the works to concentrate plots, primary network, secondary and distribution network of the Segarra – Garrigues.
  • Control of vectors
  • Design of specific environmental monitoring plans for each work, and monthly monitoring reports.
  • Attendance at mixed commission meetings.

Image

Environmental monitoring and control of works at the Port of Barcelona
-
AUTORITAT PORTUÀRIA DE BARCELONA


Environmental monitoring and control of works at the Port of Barcelona

-

AUTORITAT PORTUÀRIA DE BARCELONA

  • Environmental monitoring of works carried out at the Port of Barcelona.
  • Air and water quality, waste management
  • Characterisation of dredged material in accordance with CEDEX.

Environmental monitoring and control of works at the Port of Barcelona

AUTORITAT PORTUÀRIA DE BARCELONA

  • Environmental monitoring of works carried out at the Port of Barcelona.
  • Air and water quality, waste management
  • Characterisation of dredged material in accordance with CEDEX.

Image

Environmental Impact Study of measures to transform the irrigable area of the Segarra-Garrigues canal into irrigated land.
-
INFRAESTRUCTURES.CAT


Environmental Impact Study of measures to transform the irrigable area of the Segarra-Garrigues canal into irrigated land.

-

INFRAESTRUCTURES.CAT

  • Area transformed into irrigated land: 100,000 Ha.
  • Water supply: 342 Hm3/year.
  • Sources: Rialb reservoir, main canal (80 km), Albagés Dam (80 Hm3) and catchment from the River Segre  (69 Hm3/year)
  • Cost of corrective measures: €18.9 million

Environmental Impact Study of measures to transform the irrigable area of the Segarra-Garrigues canal into irrigated land.

INFRAESTRUCTURES.CAT

  • Area transformed into irrigated land: 100,000 Ha.
  • Water supply: 342 Hm3/year.
  • Sources: Rialb reservoir, main canal (80 km), Albagés Dam (80 Hm3) and catchment from the River Segre  (69 Hm3/year)
  • Cost of corrective measures: €18.9 million

Image

Environmental Impact Study Widening of C-25 Eix Transversal trunk road. Section: Les Oluges-Manresa. (Lleida)
-
UTE EUROPRINCIPIA - GPO


Environmental Impact Study Widening of C-25 Eix Transversal trunk road. Section: Les Oluges-Manresa. (Lleida)

-

UTE EUROPRINCIPIA - GPO

  • Widening between PK 87+700 and PK 132+300.
  • Length: 44.6 km
  • Budget for corrective measures: €1.4 million
  • Total budget: €170 million.

Environmental Impact Study Widening of C-25 Eix Transversal trunk road. Section: Les Oluges-Manresa. (Lleida)

UTE EUROPRINCIPIA - GPO

  • Widening between PK 87+700 and PK 132+300.
  • Length: 44.6 km
  • Budget for corrective measures: €1.4 million
  • Total budget: €170 million.

Image

Environmental Impact Study of the new tram system between Bellaterra and Montcada i Reixac (Barcelona)
-
INFRAESTUCTURES.CAT


Environmental Impact Study of the new tram system between Bellaterra and Montcada i Reixac (Barcelona)

-

INFRAESTUCTURES.CAT

  • 12.3 km urban light railway line communicating the towns of Bellaterra (UAB), Cerdanyola , Ripollet and Montcada i Reixac.
  • Budget for corrective measures: €610,000
  • Total investment: €228 million

Environmental Impact Study of the new tram system between Bellaterra and Montcada i Reixac (Barcelona)

INFRAESTUCTURES.CAT

  • 12.3 km urban light railway line communicating the towns of Bellaterra (UAB), Cerdanyola , Ripollet and Montcada i Reixac.
  • Budget for corrective measures: €610,000
  • Total investment: €228 million

Image

Environmental Impact Study FMB project for Line 9. Section 1: Airport-Logistic Park
-
INFRAESTRUCTURES.CAT


Environmental Impact Study FMB project for Line 9. Section 1: Airport-Logistic Park

-

INFRAESTRUCTURES.CAT

  • 9 km underground section between Barcelona Airport T1 and Logistic Park in the city of Barcelona.
  • Possible effects on protected aquifers in the Llobregat Delta
  • Budget for corrective measures: €1.2 million
  • Overall budget: €400 million.

Environmental Impact Study FMB project for Line 9. Section 1: Airport-Logistic Park

INFRAESTRUCTURES.CAT

  • 9 km underground section between Barcelona Airport T1 and Logistic Park in the city of Barcelona.
  • Possible effects on protected aquifers in the Llobregat Delta
  • Budget for corrective measures: €1.2 million
  • Overall budget: €400 million.

Image

Environmental Impact Study Widening of C-25 Eix Transversal trunk road. Section: Les Oluges-Manresa. (Lleida)
-
GISA


Environmental Impact Study Widening of C-25 Eix Transversal trunk road. Section: Les Oluges-Manresa. (Lleida)

-

GISA

  • Widening between PK 87+700 and PK 132+300.
  • Length: 44.6 km
  • Budget for corrective measures: €1.4 million
  • Total budget: €170 million.

Environmental Impact Study Widening of C-25 Eix Transversal trunk road. Section: Les Oluges-Manresa. (Lleida)

GISA

  • Widening between PK 87+700 and PK 132+300.
  • Length: 44.6 km
  • Budget for corrective measures: €1.4 million
  • Total budget: €170 million.

Image

Corrective measures on environmental impact of work on Ferreries link road (Minorca)
-
FERROVIAL AGROMAN S.A


Corrective measures on environmental impact of work on Ferreries link road (Minorca)

-

FERROVIAL AGROMAN S.A

  • 4.2 km trunk and one tunnel
  • 89,000 mhydro seedings
  • Searches for sea turtle
  • Nursery plant production
  • Protection ethnographic heritage
  • 900 macoustic screens
  • Budget: €23 million

Corrective measures on environmental impact of work on Ferreries link road (Minorca)

FERROVIAL AGROMAN S.A

  • 4.2 km trunk and one tunnel
  • 89,000 mhydro seedings
  • Searches for sea turtle
  • Nursery plant production
  • Protection ethnographic heritage
  • 900 macoustic screens
  • Budget: €23 million

Image

Implementation of the Water Framework Directive. Quality of port water bodies in the Port of Barcelona (Barcelona)
-
AUTORITAT PORTUÀRIA DE BARCELONA


Implementation of the Water Framework Directive. Quality of port water bodies in the Port of Barcelona (Barcelona)

-

AUTORITAT PORTUÀRIA DE BARCELONA

  • Water Framework Directive (2000/60/EC)
  • Quality parameters: thermohaline circulation, turbidity, transparency, suspended matter, pH, BO5, COT, dissolved oxygen, percentage saturation, nutrients, N/P, chlorophyll.

Implementation of the Water Framework Directive. Quality of port water bodies in the Port of Barcelona (Barcelona)

AUTORITAT PORTUÀRIA DE BARCELONA

  • Water Framework Directive (2000/60/EC)
  • Quality parameters: thermohaline circulation, turbidity, transparency, suspended matter, pH, BO5, COT, dissolved oxygen, percentage saturation, nutrients, N/P, chlorophyll.

Image

Characterisation of the bionomy of the Mataró coast (Barcelona)
-
DIPUTACIÓN DE BARCELONA


Characterisation of the bionomy of the Mataró coast (Barcelona)

-

DIPUTACIÓN DE BARCELONA

  • Mapping seabed morphology (4,000 Ha)
  • Type of substrate, bathymetry, and characterisation of communities associated with posidonia meadows
  • Natura 2000 Network, Site of Community Importance – Maresme Coast (ES5110017)

Characterisation of the bionomy of the Mataró coast (Barcelona)

DIPUTACIÓN DE BARCELONA

  • Mapping seabed morphology (4,000 Ha)
  • Type of substrate, bathymetry, and characterisation of communities associated with posidonia meadows
  • Natura 2000 Network, Site of Community Importance – Maresme Coast (ES5110017)

Image

Bionomic and bathymetric survey of the Cap de Creus Integral Nature Reserve and the Cap Gros-Cap de Creus and Cap Norfeu partial nature reserves (Girona)
-
PORTS DE LA GENERALITAT


Bionomic and bathymetric survey of the Cap de Creus Integral Nature Reserve and the Cap Gros-Cap de Creus and Cap Norfeu partial nature reserves (Girona)

-

PORTS DE LA GENERALITAT

  • Area: 837 ha
  • Equipment used: Multibeam Echosounder and Side Scan Sonar
  • Bathymetric and bionomic survey using transects

Bionomic and bathymetric survey of the Cap de Creus Integral Nature Reserve and the Cap Gros-Cap de Creus and Cap Norfeu partial nature reserves (Girona)

PORTS DE LA GENERALITAT

  • Area: 837 ha
  • Equipment used: Multibeam Echosounder and Side Scan Sonar
  • Bathymetric and bionomic survey using transects

Image

Environmental management of works to extend Port Ginesta – Sitges (Barcelona)
-
PUERTO GINESTA SA


Environmental management of works to extend Port Ginesta – Sitges (Barcelona)

-

PUERTO GINESTA SA

  • Area of 107,000 m2
  • Forms part of Garraf Natural Park.
  • Importance of cliffs as habitat for protected bird species.
  • Creation of a new beach as a compensatory measure, with quality parameters for dredged material in accordance with CEDEX

Environmental management of works to extend Port Ginesta – Sitges (Barcelona)

PUERTO GINESTA SA

  • Area of 107,000 m2
  • Forms part of Garraf Natural Park.
  • Importance of cliffs as habitat for protected bird species.
  • Creation of a new beach as a compensatory measure, with quality parameters for dredged material in accordance with CEDEX

Image

Environmental management of works to extend the Port of Barcelona
-
AUTORITAT PORTUÀRIA DE BARCELONA


Environmental management of works to extend the Port of Barcelona

-

AUTORITAT PORTUÀRIA DE BARCELONA

  • Control of compliance with EIS.
  • Characterisation of dredged material in accordance with CEDEX.
  • Analyses of water and air.
  • Waste management.
  • Measures to conserve protected species in the Llobregat Delta.

Environmental management of works to extend the Port of Barcelona

AUTORITAT PORTUÀRIA DE BARCELONA

  • Control of compliance with EIS.
  • Characterisation of dredged material in accordance with CEDEX.
  • Analyses of water and air.
  • Waste management.
  • Measures to conserve protected species in the Llobregat Delta.

Image

Environmental monitoring and control of works at the Port of Barcelona
-
AUTORIDAD PORTUARIA DE BARCELONA


Environmental monitoring and control of works at the Port of Barcelona

-

AUTORIDAD PORTUARIA DE BARCELONA

  • Environmental monitoring of all works carried out at the Port of Barcelona.
  • Air and water quality, waste management
  • Characterisation of dredged material in accordance with CEDEX.

Environmental monitoring and control of works at the Port of Barcelona

AUTORIDAD PORTUARIA DE BARCELONA

  • Environmental monitoring of all works carried out at the Port of Barcelona.
  • Air and water quality, waste management
  • Characterisation of dredged material in accordance with CEDEX.

Image

Monitoring aquifers around the Berta quarry. Sant Cugat del Vallès
-
JAIME FRANQUESA SA


Monitoring aquifers around the Berta quarry. Sant Cugat del Vallès

-

JAIME FRANQUESA SA

  • Monitoring using continuous measurement equipment: water level, temperature and conductivity
  • Network of 10 points: 3 surface piezometers and 7 at depth
  • Data obtained at 10-minute frequencies

Monitoring aquifers around the Berta quarry. Sant Cugat del Vallès

JAIME FRANQUESA SA

  • Monitoring using continuous measurement equipment: water level, temperature and conductivity
  • Network of 10 points: 3 surface piezometers and 7 at depth
  • Data obtained at 10-minute frequencies

Image

Monitoring the passage of fauna along the Sant Genís riverbed. Olost turnoff
-
INFRAESTRUCTURES.CAT


Monitoring the passage of fauna along the Sant Genís riverbed. Olost turnoff

-

INFRAESTRUCTURES.CAT

  • Monitoring using thermal movement sensor equipped with high definition night vision camera
  • Installation of 2 sensors to monitor for one month
  • 96 captures made using the 2 sensors
  • Between them, the 2 sensors detect around 10 different species

Monitoring the passage of fauna along the Sant Genís riverbed. Olost turnoff

INFRAESTRUCTURES.CAT

  • Monitoring using thermal movement sensor equipped with high definition night vision camera
  • Installation of 2 sensors to monitor for one month
  • 96 captures made using the 2 sensors
  • Between them, the 2 sensors detect around 10 different species

Image

Environmental Control Plan for works at Alba Park. Partial development plan for Cerdanyola del Vallès.
-
CONSORCI DE CERDANYOLA


Environmental Control Plan for works at Alba Park. Partial development plan for Cerdanyola del Vallès.

-

CONSORCI DE CERDANYOLA

Partial development plan for Cerdanyola del Vallès.

  • Total area of Partial Plan: 240 Ha
  • Monitoring of surface and underground water quality
  • Monitoring of environmental noise quality
  • Monitoring of air quality
  • Monitoring of quality of natural habitats and biological corridors
  • Archaeological monitoring

Environmental Control Plan for works at Alba Park. Partial development plan for Cerdanyola del Vallès.

CONSORCI DE CERDANYOLA

Partial development plan for Cerdanyola del Vallès.

  • Total area of Partial Plan: 240 Ha
  • Monitoring of surface and underground water quality
  • Monitoring of environmental noise quality
  • Monitoring of air quality
  • Monitoring of quality of natural habitats and biological corridors
  • Archaeological monitoring

Image

Integral Environmental Control Plan for works at the Port of Barcelona
-
AUTORITAT PORTUÀRIA DE BARCELONA


Integral Environmental Control Plan for works at the Port of Barcelona

-

AUTORITAT PORTUÀRIA DE BARCELONA

  • Works within the area of the Port of Barcelona with Environmental Impact Statement
  • Mixed commission for works monitoring and control
  • Control of environmental management by construction companies
  • Monitoring environmental vectors: sea water, sea bed, underground water, air quality, etc.

Integral Environmental Control Plan for works at the Port of Barcelona

AUTORITAT PORTUÀRIA DE BARCELONA

  • Works within the area of the Port of Barcelona with Environmental Impact Statement
  • Mixed commission for works monitoring and control
  • Control of environmental management by construction companies
  • Monitoring environmental vectors: sea water, sea bed, underground water, air quality, etc.

Image

Monitoring environmental sensorisation of works to build the new Florida market. L’Hospitalet de Llobregat
-
FERROVIAL


Monitoring environmental sensorisation of works to build the new Florida market. L’Hospitalet de Llobregat

-

FERROVIAL

  • Remote environmental monitoring
  • Monitoring of PM10 and noise using low-cost sensors.
  • 2 control points around the works for the new market.
  • Environmental analysis in real time
  • Consulting services for the implementation of improvement works and proposed corrective measures

Monitoring environmental sensorisation of works to build the new Florida market. L’Hospitalet de Llobregat

FERROVIAL

  • Remote environmental monitoring
  • Monitoring of PM10 and noise using low-cost sensors.
  • 2 control points around the works for the new market.
  • Environmental analysis in real time
  • Consulting services for the implementation of improvement works and proposed corrective measures

Image

Environmental sensorisation. Reform of Avinguda Diagonal as regards passages, side lanes and pavements. Francesc Macià-Passeig de Gràcia section. Barcelona
-
BIMSA


Environmental sensorisation. Reform of Avinguda Diagonal as regards passages, side lanes and pavements. Francesc Macià-Passeig de Gràcia section. Barcelona

-

BIMSA

Francesc Macià-Passeig de Gràcia section. Barcelona

  • Remote environmental monitoring
  • Monitoring of PM10 and noise using low-cost sensors.
  • 5 control points along the section of works.
  • Environmental  audit in real time (hourly and daily data)
  • Consulting services for the implementation of improvement works and proposed corrective measures

Environmental sensorisation. Reform of Avinguda Diagonal as regards passages, side lanes and pavements. Francesc Macià-Passeig de Gràcia section. Barcelona

BIMSA

Francesc Macià-Passeig de Gràcia section. Barcelona

  • Remote environmental monitoring
  • Monitoring of PM10 and noise using low-cost sensors.
  • 5 control points along the section of works.
  • Environmental  audit in real time (hourly and daily data)
  • Consulting services for the implementation of improvement works and proposed corrective measures

Image

Noise impact study of works on the tunnel and stations on sections 3 and 4 of Line 9 of the Barcelona Metro underground system  
-
UTE TRIANGLE L9_UTE GORG L9 UTE ESTACIONS L9_INFRAESTRUCTURES


Noise impact study of works on the tunnel and stations on sections 3 and 4 of Line 9 of the Barcelona Metro underground system  

-

UTE TRIANGLE L9_UTE GORG L9 UTE ESTACIONS L9_INFRAESTRUCTURES

  • Simulation using CADNA-A
  • Application of absorbent noise panels around the perimeters of the chambers
  • Covering earth moving conveyor belt; semi-underground discharge unit for tunnelling earth.
  • Change in circulation direction of trucks to remove earth.

Noise impact study of works on the tunnel and stations on sections 3 and 4 of Line 9 of the Barcelona Metro underground system  

UTE TRIANGLE L9_UTE GORG L9 UTE ESTACIONS L9_INFRAESTRUCTURES

  • Simulation using CADNA-A
  • Application of absorbent noise panels around the perimeters of the chambers
  • Covering earth moving conveyor belt; semi-underground discharge unit for tunnelling earth.
  • Change in circulation direction of trucks to remove earth.

Image

Noise impact study of the R2 and R4 railway lines in L’Hospitalet de Llobregat
-
ADU, AJUNTAMENT DE L’HOSPITALET DE LLOBREGAT.


Noise impact study of the R2 and R4 railway lines in L’Hospitalet de Llobregat

-

ADU, AJUNTAMENT DE L’HOSPITALET DE LLOBREGAT.

  • Infrastructure formed by three sections, differentiated by number and destination of lines.
  • Different configurations of the structure of the lines.
  • Type of trains: commuter, regional, medium-distance, goods.
  • Noise simulation using CADNA-A
  • Visor screens up to 10+7 m

Noise impact study of the R2 and R4 railway lines in L’Hospitalet de Llobregat

ADU, AJUNTAMENT DE L’HOSPITALET DE LLOBREGAT.

  • Infrastructure formed by three sections, differentiated by number and destination of lines.
  • Different configurations of the structure of the lines.
  • Type of trains: commuter, regional, medium-distance, goods.
  • Noise simulation using CADNA-A
  • Visor screens up to 10+7 m

Image

Study of the noise impact of the project to widen the IH 35W. North Tarrant. Section 3. Texas.
-
FERROVIAL AGROMAN SA


Study of the noise impact of the project to widen the IH 35W. North Tarrant. Section 3. Texas.

-

FERROVIAL AGROMAN SA

  • Motorway with 10 lanes, 5 in each direction
  • Pass through built-up zones with residential areas
  • Simulation by TNM 2.5
  • Quality objectives according to TxDOT
  • Study of different situations and work phases

Study of the noise impact of the project to widen the IH 35W. North Tarrant. Section 3. Texas.

FERROVIAL AGROMAN SA

  • Motorway with 10 lanes, 5 in each direction
  • Pass through built-up zones with residential areas
  • Simulation by TNM 2.5
  • Quality objectives according to TxDOT
  • Study of different situations and work phases

Image

Study of the noise impact of the C-25 Eix Transversal trunk road.
-
CEDINSA


Study of the noise impact of the C-25 Eix Transversal trunk road.

-

CEDINSA

  • Length: 50 Km
  • Simulation using CADNA-A 
  • 6,200  m2 sound absorbing panels

Study of the noise impact of the C-25 Eix Transversal trunk road.

CEDINSA

  • Length: 50 Km
  • Simulation using CADNA-A 
  • 6,200  m2 sound absorbing panels

Image

Monitoring noise levels continuously, 24 hours a day, in several households near the works on La Sagrera station access chamber, bifurcation chamber and stations. Works on Line 9 of the Barcelona Metro underground system.
-
PAYMA COTAS S.A.U._UTE –UTE Gorg L9.


Monitoring noise levels continuously, 24 hours a day, in several households near the works on La Sagrera station access chamber, bifurcation chamber and stations. Works on Line 9 of the Barcelona Metro underground system.

-

PAYMA COTAS S.A.U._UTE –UTE Gorg L9.

  • Installation of sound level meters operating continuously, 24 hours a day
  • Daily data collection
  • Compliance with the resolution passed by the Directorate General for Environmental Quality

Monitoring noise levels continuously, 24 hours a day, in several households near the works on La Sagrera station access chamber, bifurcation chamber and stations. Works on Line 9 of the Barcelona Metro underground system.

PAYMA COTAS S.A.U._UTE –UTE Gorg L9.

  • Installation of sound level meters operating continuously, 24 hours a day
  • Daily data collection
  • Compliance with the resolution passed by the Directorate General for Environmental Quality

Image

Monitoring of noise and vibration levels around the works to extend the FGC railway line in Sabadell.
-
UTE TÚNEL SABADELL


Monitoring of noise and vibration levels around the works to extend the FGC railway line in Sabadell.

-

UTE TÚNEL SABADELL

  • Continuous, 24-hour noise measurement in the external environment for several different works and station activities, different receivers.
  • Measurement of vibrations in different households along the railway line

Monitoring of noise and vibration levels around the works to extend the FGC railway line in Sabadell.

UTE TÚNEL SABADELL

  • Continuous, 24-hour noise measurement in the external environment for several different works and station activities, different receivers.
  • Measurement of vibrations in different households along the railway line

Image

Environmental study. Environmental cleaning and recovery of the Bay of Portman. (Murcia)
-
FERROVIAL


Environmental study. Environmental cleaning and recovery of the Bay of Portman. (Murcia)

-

FERROVIAL

  • The project includes mining operation of 8.5 Mm3 of sediment to be dredged
  • Expected duration: 7 years
  • On-site treatment of material at a recycling plant.
  • Restoration of mine pits.
  • Closure of the bay at 300 m from the coastline by retaining walls

Environmental study. Environmental cleaning and recovery of the Bay of Portman. (Murcia)

FERROVIAL

  • The project includes mining operation of 8.5 Mm3 of sediment to be dredged
  • Expected duration: 7 years
  • On-site treatment of material at a recycling plant.
  • Restoration of mine pits.
  • Closure of the bay at 300 m from the coastline by retaining walls

Image

Study for the management of contaminated soil in the River Llobregat diversion (Barcelona)
-
FERROVIAL AGROMAN, SA


Study for the management of contaminated soil in the River Llobregat diversion (Barcelona)

-

FERROVIAL AGROMAN, SA

  • PEIN sensitive area
  • 33,000 m3 contaminated mud
  • Drying land and transport to landfill
  • Extraction by dredge pump with 50 m3 / h flow
  • Length: 3,250 m
  • Budget: €2.8 million

Study for the management of contaminated soil in the River Llobregat diversion (Barcelona)

FERROVIAL AGROMAN, SA

  • PEIN sensitive area
  • 33,000 m3 contaminated mud
  • Drying land and transport to landfill
  • Extraction by dredge pump with 50 m3 / h flow
  • Length: 3,250 m
  • Budget: €2.8 million

Image

Environmental quality study of soil in the north, northeast and south perimeters of Passeig de Taulat 233 (Barcelona)
-
BCASA


Environmental quality study of soil in the north, northeast and south perimeters of Passeig de Taulat 233 (Barcelona)

-

BCASA

  • Site impacted by hydrocarbons in underground water
  • Application of 4 soil pits and 9 piezometers

Environmental quality study of soil in the north, northeast and south perimeters of Passeig de Taulat 233 (Barcelona)

BCASA

  • Site impacted by hydrocarbons in underground water
  • Application of 4 soil pits and 9 piezometers

Image

Environmental research and management of works in the area affected by dumping of waste, and procedure for cleaning terrain at the Fira de Bellcaire fair site in Barcelona.
-
BIMSA


Environmental research and management of works in the area affected by dumping of waste, and procedure for cleaning terrain at the Fira de Bellcaire fair site in Barcelona.

-

BIMSA

  • Installation of 5 soil pits
  • Sampling for characterisation, in accordance with RD 9/2005, at two levels
  • Water sampling: upstream and downstream
  • Design of procedure to stabilise soil and clean terrain

Environmental research and management of works in the area affected by dumping of waste, and procedure for cleaning terrain at the Fira de Bellcaire fair site in Barcelona.

BIMSA

  • Installation of 5 soil pits
  • Sampling for characterisation, in accordance with RD 9/2005, at two levels
  • Water sampling: upstream and downstream
  • Design of procedure to stabilise soil and clean terrain

Image

Proposal for the chemical decontamination of the Flix reservoir (Tarragona)
-
FERROVIAL AGROMAN SA


Proposal for the chemical decontamination of the Flix reservoir (Tarragona)

-

FERROVIAL AGROMAN SA

  • Material to be dredged: 260,000 m3
  • Retaining walls: 47,000 m2
  • 4,625 m conveyor belt
  • 929,000 t discharged in landfill
  • Budget: €160 million

Proposal for the chemical decontamination of the Flix reservoir (Tarragona)

FERROVIAL AGROMAN SA

  • Material to be dredged: 260,000 m3
  • Retaining walls: 47,000 m2
  • 4,625 m conveyor belt
  • 929,000 t discharged in landfill
  • Budget: €160 million

Image

Project, works management and expert report on hydrocarbon decontamination in the Port of Badalona (Barcelona)
-
MARINA BADALONA, SA


Project, works management and expert report on hydrocarbon decontamination in the Port of Badalona (Barcelona)

-

MARINA BADALONA, SA

  • Area decontaminated: 36,000 m2.
  • Selective excavation of pyrite waste with compacted clay
  • Mixture with magnesite and characterisation of piles
  • Earth movement: 1,000,000 m3
  • Decontamination budget: €4 million

Project, works management and expert report on hydrocarbon decontamination in the Port of Badalona (Barcelona)

MARINA BADALONA, SA

  • Area decontaminated: 36,000 m2.
  • Selective excavation of pyrite waste with compacted clay
  • Mixture with magnesite and characterisation of piles
  • Earth movement: 1,000,000 m3
  • Decontamination budget: €4 million